The challenge
Due to the high altitude of the site, a trailer in no way represented a permanent solution for the nature preschool. Therefore, the patrons, sponsors, volunteers and preschool directors worked together on plans for a cabin. The building’s layout took shape through a great deal of careful consideration, and provided for a large room for group activities, separate entrance lobby and cloak room as well as a separate bathroom and storage room. The building materials were to contain as much ecological wood as possible.
Our solution
Integrate GUTEX Multiplex-Top® into the wood ceiling and in the vented wood facade as insulation. Furnish all the prefabricated modules, including the floors, walls and ceiling with wood fibre blown-in insulation. Install GUTEX Multiplex-top® over the rafters to provide a wind- and rain-tight sub roof. Integrate finger splice joined glulam boards, manufactured from European silver fir and milled to produce grooves and fit on 10-mm thick GUTEX wood fibre boards to create a sound absorbing panel under the roof.
Project features
60-square-metre wood house to accommodate 20 children with large windows, attractive wood stove with heat-storing masonry components, but no electricity, no running water and just a camping toilet. Many sponsors and volunteers pitched in to make the project possible, including Braas, Witholz, Holzwerkstatt Ebi, Raab Karcher, Schreinerei Maier and GUTEX.
Roof U-value: 0.19 W/ (m2K)
Wall U-value: 0.23 W/ (m2K)
Ceiling U-value: 0.20 W/ (m2K)
Time lag: between 9.5 and 10.9 hours
Construction solutions
Would you like to see the construction details? You'll find similar constructions described here.
GUTEX products used
Info packages
Conveniently order comprehensive information, including technical data sheets, brochures, workshop schedules, etc.